Bitumen has been made from petroleum refined process. The main character like a glue because it's a good combination between solid material A and solid material B.
The important character is flexible because it can loaded with heavy truck and not broken in hot temporary. However it can prevent seepage of water into the rock under the road also.
With it's main character above. Made bitumen will be use for road construction.
We have Bitumen as the following specification:
Test |
Methodology |
40-50 |
60-70 |
85-100 |
Specific Gravity @ 25/25 C |
D-70 |
1.01-1.06 |
1.01-1.06 |
1.01-1.05 |
Penetration @ 25 C |
D-5 |
40-50 |
60-70 |
80-85/100 |
Softening Point C |
D-36 |
52/60 |
49/56 |
45/52 |
Ductility @ 25 C |
D-113 |
100 min |
100 min |
100 min |
Loss on Heating (wt) % |
D-6 |
0.5 max |
0.5 max |
0.5 max |
Drop in Penetration After Heating % |
D-6 & D-5 |
20 max |
20 max |
20 max |
Flash Point C |
D-92 |
250 min |
250 min |
250 min |
Spot Test |
A.A.S.H.O.T.102 |
Negative |
Negative |
Negative |
We can surve Bitumen as the following status.
New Steel Drums
Steel Drums : 110 drums of each 183 +/-3 Kgs to be stuffed in 20’ container for shipment.
Drum Specification:
Net Weight: 183 Kgs (+/-3 Kgs)
Gross Weight: 192 Kgs (+/-3Kgs)
Height: 980 mm
Dia: 500 mm
Thickness: 0.60 mm
A) In Bulk Vessel
Material shipped in heated tanks bulk vessel, discharged directly in to buyers terminals.
B) Packed in Polyethylene Bags
The bags capacity ranges from 35 Kgs to 300 Kgs per bag.